csuitemind logo
  • Quotes
  • Facts
  • Success
  • Books
  • Biography
  • On this day
  • Images

Alps Facts

The Gotthard Base Tunnel is also the first flat route through the Alps or any other major mountain range, with a maximum height of 549 metres (1,801 ft) above sea level, corresponding to that of Berne.

  • Railway
  • Gotthard Base Tunnel
  • Alps

The total Alps transit projected cost of the project was 9.8 billion Swiss francs (€8.85 billion, US$10.3 billion; the final cost exceeded $12 billion. Nine people died during construction.

  • Money
  • Gotthard Base Tunnel
  • Alps

Related Topics

  • Carbonatite
  • Obsidian
  • Granite
  • Largest Rivers
  • Mesosphere
  • Flint
  • Australia zoo
  • Sandstone
  • Limestone
  • Pegmatite

Fact Categories

  • Education
  • Psychology
  • Countries and places
  • Plants and Fruits
  • Humain body
  • Nature
  • Fun
  • Technology
  • Science
  • Famous people
More categories
csuitemind logo

Site

  • Home
  • Quotes
  • Facts
  • Success
  • Books
  • Biography
  • Happened on this day
  • Images

Pages

  • About Us
  • Contact Us
  • Submit a Quote
  • Submit a Fact
  • Fact of the Day
Copyright © 2015-2026 CSuiteMind